Project Topic

Project Attributes
 Format: MS word ::   Chapters: 1-5 ::   Pages: 45 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   1280 people found this useful

Project Department

Project Body

CHAPTER 1

 

 

INTRODUCTION

 

 

1.1 THE BACKGROUND

 

 

Welding is a way of heating pieces of metal using electricity or a flame so that they melt and stick together. It can simply be defined as the process of joining two or more pieces of metal to make the act as a single piece. This is often done by melting the work pieces and adding a filler material to form a pool of molten material that cools to become a strong joint. Because of its strength, welding is used to join beams when constructing buildings, bridges and other structures. Welding can also be used to join pipes in pipelines, power plants at the construction sites and in home appliance. Furthermore, welding is used in shipbuilding, automobile manufacturing and repair, aerospace applications. There are many kinds of welding which include arc welding, resistance welding, gas welding among others. Emphasis will be laid on arc welding because it is the most common type of welding as well as the main aim of this project.

 

Arc welding is the process of welding that utilizes an electrical discharge (arc) to join similar materials together. Equipment that performs the welding operation under the observation and control of a welding operator is known as welding machine. To solve the problem of weight and size of conventional arc

 

welding machine, it is necessary to design an inverter. The inverter provides much higher frequency than 50Hz or 60Hz supply for transformer used in welding. So transformer of much smaller mass is used to permit the handling of much greater output power. The welding noise produce by conventional arc welding machine is reduced by selecting the operating frequency over the hearing of human ability. The choice of 20Khz for the inverter type arc welding machine was determined to meet the above expectation. The output welding current is controlled by controlling the power supply for transformer at high frequency. This power supply is provided by a frequency inverter. Power switch IGBTs (Insulated Gate Bipolar Transistor) or MOSFETs is used for the inverter design due to its high switching. The control circuit use to control the output welding current is design to drive the power switch at high frequency. Insulated Gate Bipolar Transistor power switch is more efficient and less prone to failure than MOSFETs power switch.

  1. AIMS AND OBJECTIVES OF THE PROJECT

 

The main aim and objective of this project is to design and build and arc

 

welding machine that operates on 36vdc at variable frequency which of benefit to urban area. This reduces the weight and size of the transformer use for welding. To have an arc welding machine that is more efficient which produce neat welding.

 

1.3 SIGNIFICANT OF THE STUDY

 

The significant of this project is that it seeks to develop an arc welding machine that is cost effective, strong and portable. Not only that the arc welding machine is strong and portable, it is also mobile.

 

1.4 LIMITATION OF THE PROJECT

 

The project has certain limitations which are mentioned below.

 

  • This project cannot weld bigger gauge of metals.

 

  • The welding time and power depends on the battery input power.

 

  • You are to have bands of battery for reliability when using battery.

 

  • The machine must be used by a qualified welder. Welding can endanger the operator or people near the working area. Therefore, the performance of welding

 

and cutting must only be done under the comprehensive observation of all relevant safety regulation.

 

  • Switch function modes during welding could potentially damage the equipment. A safety switch is necessary to prevent the equipment from electric leakage. Use

 

only high quality welding tools and equipment with this inverter type arc welding machine

 

1.5     PROJECT REPORT ORGANIZATION

 

The organization of the project report is well detailed and vast in its coverage. It covers all the activities encountered during the research work. The first chapter is the introductory chapter which covers the background, project objectives, project justification, and scope of the project. Chapter two presents the literature reviews. Chapter three covers the system analysis and design methodology in details. Chapter four presents the system implementation which entails the circuits diagram of different stages and also the complete schematic diagram with necessary calculation involve in the design. Chapter five is emphasis on conclusion, problem encountered during project design, recommendations and suggestion for further improvement. Fig1.1 depicts an overview of project report organization.

 

 

 

 

Introduction

 

 

 

 

 

Literature review

 

 

 

 

 

Methodology and

 

system analysis

 

 

 

 

 

System Design and

 

Implementation

 

 

 

 

 

System testing

 

 

 

 

 

 

Summary, recommendation and conclusion

 

 

Fig1.1 An overview of project report organization

Get the complete project »

Can't find what you are looking for?
Call 0906 809 7513

  • Subscribe to Free Job Alert
    Enter your email below and click subscribe

    LATEST JOB VACANCIES


    We require the services of an experienced Business Development Manager with a wide range of business clientele and a network of c... Read more

    Regulate day-to-day operations of unit in conjunction with Departmental Heads, Manager, Executive Chef, Security. Cordinate and l... Read more

    FINANCE OFFICER

    LEAD Enterprise Support Company Limited in (Lagos State)
    Job Objective: The Finance Officer will assist the Finance/Admin Manager in the implementation of the HMO’s accounting policies an... Read more

    Copyright © 2024 All Right Reserved CVClue
    A Subsidiary of EMINENT INFO TECH VENTURES